We pride ourselves in the extensive experience that we have which supports our company and our services. We have had the opportunity in the past to be a part of numerous projects across Australia and continue to bring our expertise and service to projects today.
Principle: BHP
Duration: Aug 2017 - Sep 2017
Role: Contractor
Asia Pacific Piping Systems, in partnership with Georg Fisher, have supported a civil contractor with the installation and testing of three 1 000-millimetre Electro-Fusion couplers. This project required highly skilled personnel and specialised tooling to perform the works in tight, congested trenched areas.
Principle: Rio Tinto
Duration: Nov 2017 - Mar 2018
Role: Subcontractor
Pit de-watering and accompanying 14-kilometre pipelines across multiple sites installing PN16 110 millimetre to 250-millimetre HDPE throughout. Works included five de-watering bores, earthworks, pipeline installation, hydro-testing, Brownfield’s tie-ins, and service commissioning.
Principle: Rio Tinto
Duration: Nov 2017 - Mar 2018
Role: Subcontractor
By working closely with key mining and operations stakeholders at Tom Price mine, APPS completed and restored services on time and with an exemplary safety record. These works were complete in conjunction with the WTS fire repairs.
Principle: Northern Minerals
Duration: May 2017 - May 2017
Role: Subcontractor
Installation of 14 kilometres of 125-millimetre and 160- millimetre HDPE pipelines connecting two bores to pilot plant and dosing tank. Provision of specialised HDPE welder and equipment, supporting plant operator for work in arid challenging remote location. Completion of scope ahead of planned schedule and under budget.
Principle: Rio Tinto
Duration: Jan 2017 - Mar 2017
Role: Subcontractor
Installation of 355- millimetre SDR9 over 2.5 kilometres HDPE waste fines pipeline for three in-pit slurry droppers. The scope included live tie-ins to existing steel pipework, 110 millimetre and 250millimetre piped crossings at haul road culverts, supporting earthworks for LV/HV ramps at crossings, 710-millimetre culverts, containment ponds and hydro testing.
Principle: Rio Tinto
Duration: Aug 2016 - Jan 2017
Role: Subcontractor
Installation of 17 kilometres HDPE pipeline ranging from 450- millimetres to 160- millimetres bore trailer connections, LV/HV standpipes, turkeys nest pipe work & pumps and Hydro testing. Provision of subcontracting services including Superintendent, HDPE welders, operator’s, plumbers, pipefitters, plant and equipment, servicing, and procurement.
If you’re in need of piping systems installation expertscall our team today. Fill out our enquiry form and a member of our team will be in touch with you as soon as possible.
© 2021 Asia Pacific Piping Systems | Privacy Policy | Designed by iseekplant.com.au
© 2021 Asia Pacific Piping Systems
Designed by iseekplant.com.au
Get a free quote by filling out the online form, or speak with a member of our team now by calling us today.